Construction of a Modern Civil Defense Protective Shelter

Our company has implemented a full range of works for the construction of a modern civil defense protective shelter. The project was of strategic importance for ensuring a safe educational process under martial law conditions.

Works Performed:

  • Preparatory and Earthworks: site clearance, excavation arrangement using sheet pile enclosure for soil stabilization.
  • Structural Solutions: installation of foundation slabs, erection of walls using prefabricated reinforced concrete wall panels and slabs with a high degree of protection.
  • Engineering Systems:
    • Installation of an autonomous ventilation and air conditioning system with absorption filters.
    • Installation of water supply, sewerage, and heating systems.
    • Installation of modern electrical networks and lighting.
  • Security Systems: installation of automatic fire alarm system, notification system, installation of airtight and fire-resistant doors.
  • Autonomy: installation and commissioning of a 75 kVA diesel generator for uninterrupted power supply to the facility.
  • Inclusivity and Accessibility: installation of a lifting platform (elevator) for persons with reduced mobility, tactile navigation, and full compliance with DBN requirements for accessibility.
  • Site Improvement: restoration of road surface, paving installation, landscaping, and fence installation.

Result: A reliable protective shelter has been created that meets all state building codes of Ukraine and guarantees maximum safety for students and lyceum staff.

Voskresenska Village Council

MINISTRY OF FOREIGN AFFAIRS OF DENMARK

UNOPS

Need Consultation?

Submit a request and our specialists will contact you shortly!

Submit a request
Need Consultation?